Over Stove Cabinet
Before:
Stove fire burned the side gable and face frame of the upper cabinet.
After:
Burn mark sanded out, colour rematched, and clear coated. Side of cabinet sanded down, rematched colour and clear coated. Under cabinet reveneered.
Time: Approx 3 hours on site, 12 hours drying time.